BND2 — Maintain earth banks or stone-faced hedgebanks
£11 / m / year3-year agreement
Action’s aim
This action’s aim is that there are earth banks or stone-faced hedgebanks maintained in good condition.
The purpose of this is to:
- help manage livestock
- provide habitats for lichens, mosses and ferns, and wildlife
- maintain landscape and historic features
Where you can do this
To be eligible for this action, the bank must be:
- either a raised earth or turf-faced bank (an earth bank), or a raised earth bank faced with natural stone (a stone-faced hedgebank) – there can be woody growth on top of the bank (for example, Cornish or Devon hedges)
- distinct from the surrounding landform
- a land parcel boundary
- at least 20m long, measured between 2 end points – read the ‘advice to help you do this action’ to find out how to measure this
- in good condition
To be in good condition, the earth bank or stone-faced hedgebank must be both:
- continuous, with no gaps along its entire length
- complete, so the bank is at a height in keeping with local style and a stone-faced hedgebank has facing stones in place
What to do
You must maintain earth banks or stone-faced hedgebanks entered into this action in good condition. To do this, you must:
- visually check their condition and identify any sections that need to be repaired
- carry out any necessary repairs
- keep a record (written or photographic) of any need for repairs you identify, and the repair work you do – including the date you identify the need and when the work was done
- retain any existing features such as top stones, sheep creeps, stiles and stone gate posts
When you carry out any necessary repairs, you must retain any existing features such as top stones, sheep crops, stiles and stone gate posts.
When to do it
You must:
- check the condition of the banks at least once during each year of this action’s 3-year duration
- carry out any necessary repairs within 12 months of identifying the need, or by this action’s end date if you identify need for repairs during the final year of this action’s duration
How to do it
It’s up to you how you do this action, as long as you:
- follow this action’s requirements – these are identified by a ‘must’
- do the action in a way that could reasonably be expected to achieve this action’s aim
You may find it helpful to read the ‘advice to help you do this action’, but it’s not part of this action’s requirements.
Evidence to keep
You must keep the required written or photographic record and supply this evidence if we ask for it.
Advice
Optional advice for BND2: Maintain earth banks or stone-faced hedgebanks .
Can be combined with
Want to know if this actually applies to your farm, and roughly what it’d be worth alongside everything else you’re eligible for?
Get your planVerbatim from GOV.UK’s SFI26 actions guidance. Estimates are based on published rates, not a guarantee of payment — see our disclaimer.