WBD2 — Manage ditches
£4 / m / year3-year agreement
Action’s aim
This action’s aim is that there are ditches with:
- varied bankside and aquatic vegetation
- undisturbed wildlife habitat
The purpose of this is to:
- maintain vegetation that’s typical of wet ditches
- provide habitats for wildlife
Where you can do this
An eligible ditch for this action must:
- form part of the boundary of a land parcel that’s located below the moorland line
- be a man-made, long and narrow linear channel that’s cut into the ground for the purpose of draining the land or managing water levels
- have vegetated banks
- regularly contain standing or flowing water
The following features are not eligible for this action:
- ditches located in a severely disadvantaged area ( SDA ) below the moorland line
- culverts or underground drains
- natural watercourses, such as streams
- non-linear water features, such as ponds, lakes or reservoirs
- grips, gutters and foot drains
What to do
You must manage the ditch in a way that can reasonably be expected to achieve this action’s aim, including:
- cutting vegetation at the top of the ditch bank in rotation, so you only cut up to half the length of the ditch bank in any year of this action’s 3-year duration
- carrying out in-channel management on any section of the ditch no more than once during this action’s 3-year duration – this includes cleaning out silt or vegetation and cutting vegetation in the ditch channel
To minimise disturbance to wildlife, you must only manage the ditch during the autumn, winter and early spring (usually September to late March).
You must not re-profile or increase the width or depth of the ditch.
When to do it
You must do this action from its start date, throughout each year of its 3-year duration.
If this action’s start date means it’s too late for you to do this action, you must start doing it within 12 months of the action’s start date.
How to do it
It’s up to you how you do this action, as long as you:
- follow this action’s requirements – these are identified by a ‘must’
- do the action in a way that could reasonably be expected to achieve this action’s aim
You may find it helpful to read the ‘advice to help you do this action’, but it’s not part of this action’s requirements.
Evidence to keep
Keep evidence to show what you’ve done to complete this action, such as:
- ditch management operations at a land parcel level and associated invoices
- photographs and other documentation
If it’s not clear that you’ve done this action in a way that could reasonably be expected to achieve its aim, we may ask for this evidence. You must supply the evidence if we ask for it.
Advice
Optional advice for WBD2: Manage ditches .
Can be combined with
Want to know if this actually applies to your farm, and roughly what it’d be worth alongside everything else you’re eligible for?
Get your planVerbatim from GOV.UK’s SFI26 actions guidance. Estimates are based on published rates, not a guarantee of payment — see our disclaimer.